A twin-screw imported (Kobelon, Germany) extrusion equipment, due to its long service life and aging of control electrical components, has a frequent failure rate. On February 27, 2025, a site survey was conducted and the following plan was proposed
Shanghai Pulite Composite Materials Co., Ltd., a twin-screw imported (Kobelon, Germany) extrusion equipment, has been in use for a long time, causing aging of control electrical components and frequent failure rates. On February 27, 2025, a site survey was conducted and the following plan was provided,
|
Number
|
name
|
notes
|
scheme
|
|
1
|
Customize 1 new electrical cabinet
|
Size; 2 meters high, 0.6 meters long, and 1.1 meters wide
|
Placed in the air-conditioned room
|
|
2
|
Touch Screen
|
10 inch Kunlun connectivity with remote Internet of Things
|
Network remote monitoring and debugging in different locations
|
|
3
|
PLC
|
Siemens
|
Communication with frequency converter
|
|
4
|
Heating collection AD module
|
Siemens
|
Perform 16 zone heating with 2 backup channels
|
|
5
|
Heating output DA module
|
Siemens
|
Perform 16 zone heating with 2 backup channels
|
|
6
|
control mode
|
Ethernet communication
|
|
|
7
|
Electrical components
|
schneider
|
|
|
8
|
Solid state relay
|
Yangming, Taiwan
|
Suggest using 80A with higher power
|
|
9
|
Main electrical cabinet (air switch)
|
Schneider 500A
|
Replace the old electrical cabinet from the past
|
|
10
|
Feeding machine 1 # (1.5KW)
|
Inverter Swiss ABB
|
Touch screen operation - Set display frequency
|
|
11
|
Feeding machine 2 # (1.5KW)
|
Inverter Swiss ABB
|
Touch screen operation - Set display frequency
|
|
12
|
cooling valve
|
14 zone switch
|
|
|
13
|
Twin screw extrusion testing
|
Solution temperature, pressure,
|
If collecting the original pressure sensor does not work, consider replacing it with a (Jeffren, Italy) sensor
|
|
14
|
Main motor drive 185KW
|
Germany (BMW)
|
Perform communication control. Touch screen
|
|
15
|
Specific details
|
Need to confirm with (Mr. Feng, Mr. Liu)
|
Provide on-site installation and debugging services
|
|
16
|
Touch screen
|
Equipped with a suspension structure for free operation
|
Put it in its original position
|
|
17
|
cycle
|
Complete within 40 days. If urgent within 30 days is required
|
Non standard customization
|
|
Party A
|
Contact
|
Yang Gong;15285105474
|
|
|
Party B
|
Contact
|
Chen;18071870860
|
|

Schematic diagram of the electrical cabinet, installing the touch screen on the original extruder platform and placing the electrical cabinet in the air conditioning room,