Project Introduction: The project is located north of Boyi Road, Beicheng Street, Lianchi plot, Hongta Industrial Park. On January 8, 2024, the Natural Resources Bureau of Hongta District, Yuxi City issued a construction project planning permit (Jianzi No. Hongta District 202400003) for this project. The construction unit is now applying to adjust the construction scale of the recycling area due to the adjustment of the process flow of the operation recycling area. The planning indicators have been changed accordingly. The planned design scheme is as follows: the total land area is 323747 square meters (194998.28 square meters in the first phase, 128748.72 square meters in the later phase), the total construction area is 210200.24 square meters (122312.64 square meters in the first phase, 210200.24 square meters in the later phase), the total capacity building area is 378350.09 square meters (216829.39 square meters in the first phase, 161520.7 square meters in the later phase), and the base area is 218216.19 square meters (125509.09 square meters in the first phase, 92707.1 square meters in the later phase). The plot ratio of the project site is 1.17, the building density is 64.44%, the green area (including protective green space) is 40446 square meters, the green area ratio is 12.49%, there are 470 motor vehicle parking spaces (285 in the first phase and 185 in the later phase), and 205 non motor vehicle parking spaces (205 in the first phase).
Construction unit: Yuxi Enjie New Materials Co., Ltd
Design Unit: Suzhou Bairun Architectural Design Co., Ltd